33.20. Provisions

A provision is recognised when the Group has a present obligation towards a third party, which amount can be reliably estimated and it is probable that an outflow of resources embodying economic benefits will be required to settle the obligation. The obligation may be legal, regulatory or contractual or it may represent a constructive obligation deriving from the Group’s actions.

The estimate of the amount of the provision corresponds to the expenditure likely to be incurred by the Group to settle its obligation. If a reliable estimate cannot be made of the amount of the obligation, no provision is recorded and the obligation is deemed to be a “contingent liability”.

Contingent liabilities – corresponding to (i) possible obligations that arise from past events and whose existence will be confirmed only by the occurrence or non-occurrence of one or more uncertain future events not wholly within the Group’s control or (ii) to present obligations arising from past events that for which it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligation or because the amount of the obligation cannot be measured with sufficient reliability – are not recognised but disclosed where appropriate in the notes to the Consolidated Financial Statements.

Provisions for dismantling and restoring sites

The Group is required to dismantle equipment and restore sites. In accordance with paragraphs 36 and 37 of IAS 37 “Provisions, Contingent Liabilities and Contingent Assets”, the provision is based on the best estimate of the amount required to settle the obligation. It is discounted by applying a discount rate that reflects the passage of time and the risk specific to the liability. The amount of the provision is revised periodically and adjusted where appropriate, with a corresponding entry to the asset to which it relates.

Search results